Are you looking for a quote on part number CK-104 LONG LEAD? If so, please fill out the form provided below. The national stock number is 5910001135499, and the part is manufactured by Crl Components Inc. Description is Capacitor Fixed Cer. The Cage Code for part number CK-104 LONG LEAD is 71590. Please enter as much detail as possible, this information will help us provide you the best quote for your needs. We will get back to you in just 15 minutes!
Part Number CK-104 LONG LEAD Specification |
|||
---|---|---|---|
Part Number : CK-104 LONG LEAD | Manufacturer : Crl Components Inc | NSN : 5910-00-113-5499 (5910001135499) | |
Item Name : Capacitor Fixed Cer | CAGE Code : 71590 | ||
Alternate P/N : CK104LONGLEAD | |||
FSC CODE : 5910 Capacitors |
“*” Symbols for mandatory fields
ASAP-Components.com, owned by ASAP Semiconductor is a leading distributor of obsolete national stock numbers. We are an, an AS9120B and ISO 9001:2015 company. We stock a vast inventory of over 10 million NSN parts which are sourced from over 5,000 manufacturers. All NSN parts such as CK-104 LONG LEAD are organized in 26 different categories with distinct supply codes.
A national stock number (NSN) part is distinguished by a specific number. This number indicates procurement, stocking, and storage of this part through the federal supply system. Part number CK-104 LONG LEAD possess the Federal Supply Group is FSC 5910 Capacitors. This part and other NSN parts are an essential part of the defense and military supply chain.
Your quote request will be answered by a member of our experienced sales team. Feel free to call us on our toll-free number, +1-714-705-4780, we are available 24/7. You can also email your Bill of Materials (BOM) to sales@asap-components.com to expedite the purchasing process.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Similar Components to NSN Part Number CK-104 LONG LEAD |
CK 0009582 K | CK 0009582 K | CK 006.5040 | CK 006.5040 |
---|---|---|---|
CK-1-8-PK4 | CK-1039-29 A1 | CK-1039-29 A1 | CK-1039-29 A1 |
CK-1039-29 A1 | CK-1039-29 A1 | CK-1052-16-A2 | CK-12 |
CK-120 | CK-13 | CK-13 | CK-14 |
CK-14 | CK 149EMCA | CK-149EMCA | CK-1500 |
CK-1500 | CK-1500 | CK 1725 | CK-177-444 |
CK-1774P28 | CK-1774P28 | CK-1774P28 | CK 1774P39 |
CK-1774P39 | CK-1774P39 | CK-1775P26 | CK-1775P26 |
Guaranteed on-time Delivery
Customized Database
Over 5100 Manufacturers
Complete Purchasing Solutions
We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.
Request for Quote